This 176-panel rooftop installation on West Chester’s administrative building is expected to generate nearly 97,000 kWh in its first year—supplying about 40% of the building’s energy needs. The system will deliver more than $600,000 in lifetime savings. The project, which the Township Administrator called a fiscally responsible step toward long-term cost savings and energy resiliency, marks Melink Solar’s third project in West Chester in 2025.